Full Text (PDF)
Review Article

Calculating the prolonged length of service time through shock model in an organization

G. Subash Chandra Bose , G. Subash Chandra Bose , P. Pandiyan , G. Sudarvizhi , R.Vinoth

Author Information

Licence:



Journal of Social Welfare and Management 4(2):p 61-64, . | DOI:
How Cite This Article:

Received : N/A         Accepted : N/A          Published : N/A

Abstract

Every organization needs a workforce suitable for its tasks in order to reach its business aims. In an organization wastages are seen when employees moving from one grade to another, are exposed to different factors influencing them to leave the organization. The threshold level is the maximum amount of wastage that can be permitted in the organization beyond which the organization reaches a point of breakdown. This paper is an attempt to determine the expected time for recruitment, assuming the threshold distribution as Generalized Rayleigh distribution introduced by Surles and Padgett 2001[1].

Keywords: Expected time; Organization; Threshold; Wastage


References (Bibliographical note)

No records found.


Funding Details


Author Information

Authors and Affiliatione

  • G. Subash Chandra Bose
    ,
  • G. Subash Chandra Bose
    ,
  • P. Pandiyan
    ,
  • G. Sudarvizhi
    ,
  • R.Vinoth
    ,

Rights & Permissions



About this article


Cite this article


Licence:



Download citation

Received Accepted Published
N/A N/A N/A
DOI:

Keywords

Search for Similar Articles

You may search for similar articles that contain these



Article Level Metrics

Last Updated

Saturday 19 April 2025, 18:16:00 (IST)


2

Accesses

00
0
00

Citations


22
11
23

View full article metrics including social shares, article views and publishing history


Article Keywords


Keyword Highlighting

Highlight selected keywords in the article text.


Timeline


Received N/A
Accepted N/A
Published N/A

licence



Access this article




Share